Are drawings required and do they need to be drawn by an architect or engineer?
Category:
Building
Yes. Drawings are required and must be signed and sealed by an architect or engineer, or you may also use high wind standards (FBC-R 301.1.1). If you choose this method, we suggest you meet with the building official prior to submitting your plans.
Updated 2/4/2021 8:59 AM